1

Alternative bridge options cost a fraction of CRC

couv logo

The Columbia River Crossing Light Rail project carries a $10 billion* price tag. To date, how the project will be funded has not been ascertained and is referred to as a “debt bomb” by Chris Girard in his preface to the Cortright Report. Despite the heavy price tag, the CRC project falls short of fixing other known transportation issues, such as the bottlenecks at the Rose Quarter and the Terwilliger Curves on the Oregon side of the river, and congestion restrained by limiting the river crossings to only two.

READ MORE: http://couv.com/featured/skyhigh